Let us know your experience, opinion or suggestion about the Recommended Practice for Forensic Schedule Analysis R29-03
|
| Posted: 31 Oct 2009 20:47 Back to top |
Guest
|
Its an invaluable Guideline, i.e. a step by step procedure.
I have implemented the Modeled / Subtructive / Single Simulation Method (collapsed as-built -CAB- analysis) plus un a "smart table" to intentify and to quantify the Delay as "Activity-Level Variance - ALV-".
I'm very grateful to AACE for this contribution.
Thank you very much.
Arsenio Gutierrez Blanco
AGB Reclamaciones
|
| Posted: 14 Dec 2009 04:48 Back to top |
Guest
|
Its an invaluable Guideline, i.e. a step by step procedure.
I have implemented the Modeled / Subtructive / Single Simulation Method (collapsed as-built -CAB- analysis) with a "smart table" to intentify and to quantify the Delay as "Activity-Level Variance - ALV-".
I'm very grateful to AACE for this contribution.
Thank you very much.
Arsenio Gutierrez Blanco
AGB Reclamaciones [/quote]
|
| Posted: 14 Dec 2009 04:50 Back to top |
Guest
|
It's an invaluable Guideline, i.e. a step by step procedure.
I have implemented the Modeled / Subtructive / Single Simulation Method (collapsed as-built -CAB- analysis) plus un a "smart table" to intentify and to quantify the Delay as "Activity-Level Variance - ALV-".
I'm very grateful to AACE for this contribution.
Thank you very much.
Arsenio Gutierrez Blanco
AGB Reclamaciones [/quote]
|