Forum Index | Forensic Scheduling | AACE Recommended Practice for Forensic Schedule Analysis R29-03
 Font colour:   Close Tags

Tip: Styles can be applied quickly to selected text.
Message:
captcha
Please enter the code shown above:
 





 

said
[quote=]Let us know your experience, opinion or suggestion about the Recommended Practice for Forensic Schedule Analysis R29-03


It's an invaluable Guideline, i.e. a step by step procedure.

I have implemented the Modeled / Subtructive / Single Simulation Method (collapsed as-built -CAB- analysis) plus un a "smart table" to intentify and to quantify the Delay as "Activity-Level Variance - ALV-".

I'm very grateful to AACE for this contribution.
Thank you very much.

Arsenio Gutierrez Blanco
AGB Reclamaciones [/quote]

Posted: 22 May 2012 17:13 Back to top





 

said
[quote=]Let us know your experience, opinion or suggestion about the Recommended Practice for Forensic Schedule Analysis R29-03


Its an invaluable Guideline, i.e. a step by step procedure.

I have implemented the Modeled / Subtructive / Single Simulation Method (collapsed as-built -CAB- analysis) with a "smart table" to intentify and to quantify the Delay as "Activity-Level Variance - ALV-".

I'm very grateful to AACE for this contribution.
Thank you very much.

Arsenio Gutierrez Blanco
AGB Reclamaciones [/quote]

Posted: 22 May 2012 17:13 Back to top





 

said
Let us know your experience, opinion or suggestion about the Recommended Practice for Forensic Schedule Analysis R29-03


Its an invaluable Guideline, i.e. a step by step procedure.

I have implemented the Modeled / Subtructive / Single Simulation Method (collapsed as-built -CAB- analysis) plus un a "smart table" to intentify and to quantify the Delay as "Activity-Level Variance - ALV-".

I'm very grateful to AACE for this contribution.
Thank you very much.

Arsenio Gutierrez Blanco
AGB Reclamaciones

Posted: 22 May 2012 17:13 Back to top





 

Let us know your experience, opinion or suggestion about the Recommended Practice for Forensic Schedule Analysis R29-03

Posted: 22 May 2012 17:13 Back to top